Myanmar oil and gas pipeline starts from Burma Kyaukpyu, via four provincial state, passes into Ruili ,Western Yunnan province,China from the south, the pipe diameter is 1016 mm, length of 793 kilometers, the designated annual transmission capacity is 12000000000 cubic meters, and the natural gas pipeline has al length of 800 km which will be able to meet 1/4.demand of natural gas in China. It’s the fourth largest energy import channel ranks after the Central Asian oil and gas pipeline, China Russia crude oil pipeline and the sea channel. Our company has supplied more than 200 sets of the German Schuck valves and the pneumatic hydraulic actuators, which are installed in 28 valve chamber and 6 oil station in Burma Burma section of the pipeline, and we have provided installation guidance and technical services for the project. On July 15, 2014 the project was put into production successfully , The equipments and service provided by our company have won high praise from the customer.